Post-UTME Past Questions - Original materials are available here - Download PDF for your school of choice + 1 year SMS alerts
WAEC offline past questions - with all answers and explanations in one app - Download for free

The Impact of Total Quality Management (TQM) on Productivity (A Case Study of Diamond Bank, LTD Owerri)

Type Project Topics (pdf)
Faculty Administration
Course Business Administration and Management
Price ₦3,000
Buy Now
Key Features:
No of Pages: 81
No of Chapters: 5
WAEC May/June 2024 - Practice for Objective & Theory - From 1988 till date, download app now - 99995
WAEC Past Questions, Objective & Theory, Study 100% offline, Download app now - 24709
Post-UTME Past Questions - Original materials are available here - Download PDF for your school of choice + 1 year SMS alerts
Abstract:
As regards to this topic, TOTAL QUALITY MANAGEMENT (TQM) it goes on reviewing the better ways of improving productivity, product quality, and deliver services. Organizations that adopt the concept of total quality management as culture in the direction of altering the behaviour of managers and employees have become low-cost, high quality and highly productive in the supply of goods and services in order to honour and support the contributions of all organizational members.

This study will also teach us or prove to us that the more an organization is able to avoid waste, build a system that emphasizes prevention rather than engage in the re-work of defective products, correcting mistakes, the higher will be the productivity level of the company.

The study will also revealed that DIAMON BANK LTD will benefited in most areas of productivity through the application of total quality management (TQM). This issue will bring about a reduction in operating cost and the concomitant effect of higher productivity, and profitability in an organization it will also influence the attitude of workers and their level of performance which calls for effective communication between management and workers.
Table of Content:
Title page
Approval page
Dedication
Acknowledgment
Table of contents
List of tables

CHAPTER ONE
1.0 Introduction
1.1 Background of the study
1.2 Statement of the problems
1.3 Objective of the study
1.4 Research questions
1.5 Significance of the study
1.6 Scope of the study
1.7 Research hypothesis
1.8 Definition of terms

CHAPTER TWO
2.0 Literature review
2.1 The concept of total quality management
2.2 Principles of total quality management
2.3 Basic tools of total quality management
2.4 Cost of quality
2.5 Total quality management and productivity

CHAPTER THREE
RESEARCH DESIGN AND METHODOLOGY
3.0 Introduction
3.1 Research design
3.2 Data collection instrument
3.3 Sources of data
3.4 Validity and reliability of the measuring instruments
3.5 Method of statistical analysis
3.6 Sampling frame
3.7 Sample size
3.8 Description of respondents

CHAPTER FOUR
DATA PRESENTATION, ANALYSIS, AND DISCUSSION OF FINDINGS
4.0 Introduction
4.1 Demographic analysis
4.2 Analysis and discussion of research questions

CHAPTER FIVE
5.0 Summary of findings, recommendations s and conclusion
5.1 Summary of finding
5.2 Recommendations
5.3 Conclusion
Buy Now
 
WAEC offline past questions - with all answers and explanations in one app - Download for free
WAEC Past Questions, Objective & Theory, Study 100% offline, Download app now - 24709
WAEC May/June 2024 - Practice for Objective & Theory - From 1988 till date, download app now - 99995
Post-UTME Past Questions - Original materials are available here - Download PDF for your school of choice + 1 year SMS alerts