WAEC May/June 2024 - Practice for Objective & Theory - From 1988 till date, download app now - 99995
WAEC offline past questions - with all answers and explanations in one app - Download for free

The Design And Construction Of A 220 / 12 Volts Single Phase Step-down Transformer

Key Features:
- No of Pages: 24

- No of Chapters: 06
WAEC offline past questions - with all answers and explanations in one app - Download for free
WAEC May/June 2024 - Practice for Objective & Theory - From 1988 till date, download app now - 99995
Post-UTME Past Questions - Original materials are available here - Download PDF for your school of choice + 1 year SMS alerts
Introduction:

Abstract

This is a technical project write-up design and construction were carried out by me with deep intensive and extensive research work.

I all give credit to the authors of the textbooks whose I referred to in the cause of writing this project and its subsequent design and construction. In this project, I shed light on the basic principle of operation, the design and construction procedure.

Critical analysis of all the functional parts of the transformer and rectifier connected to it. It will therefore, be of great in serest and suitable to all electrical engineers and engineering students.

Table of Content

Cover Page

Approval Page

Dedication

Acknowledgement

Abstract

Table of Content



CHAPTER ONE

1:0:0 INTRODUCTION

1:1:0 Objective

1:2:0 Scope of Work



CHAPTER TWO

2:0:0 LITERATURE REVIEW

2:1:0 Description of Transformer

2:2:0 Classification of Transformer

2:3:0 Types of Transformer

2:4:0 Division of Transformer

CHAPTER THREE

3:0:0 Purpose of the Device

3:1:0 Division of Transformer

3:2:0 Uses

3:3:0 Significance of Transformer (Device)



CHAPTER FOUR

4:0:0 CONSTRUCTION OF TRANSFORMER

4:1:0 Cutting of Lamination

4:2:0 Construction of Former

4:3:0 The Winding

4:4:0 Insulation

4:5:0 Construction of Rectifier

4:6:0 Materials Used



CHAPTER FIVE

5:0:0 PRINCIPLE OF OPERATION

5:1:0 Major Factor Considered

5:2:0 Rectifier Operations

5:3:0 Components Used

5:4:0 Connection of Transformer to Rectified



CHAPTER SIX

6:0:0 Conclusion

6:1:0 Summary

6:2:0 Problem Encountered

6:3:0 Recommendations

Bill of Quantity

Introduction

The introduction of this research is only available in the paid version.
Buy Now
 
WAEC Past Questions, Objective & Theory, Study 100% offline, Download app now - 24709
WAEC offline past questions - with all answers and explanations in one app - Download for free
Post-UTME Past Questions - Original materials are available here - Download PDF for your school of choice + 1 year SMS alerts
WAEC May/June 2024 - Practice for Objective & Theory - From 1988 till date, download app now - 99995