JAMB CBT Mobile App 2024 - Free Download
WAEC May/June 2024 - Practice for Objective & Theory - From 1988 till date, download app now - 99995

Impact Of Materials Management On Project Delivering In Nigeria

Type Project Topics (doc)
Faculty Sciences
Course Project Management
Price ₦3,000
Buy Now
Key Features:
- No of Pages: 41

- No of Chapters: 03
JAMB CBT Mobile App 2024 - Free Download
JAMB CBT 2024 - Candidates, Schools, Centres, Resellers - Get Ready!
WAEC May/June 2024 - Practice for Objective & Theory - From 1988 till date, download app now - 99995
WAEC Past Questions, Objective & Theory, Study 100% offline, Download app now - 24709
Introduction:

Abstract

There is no available abstract for this work.

Table of Content

1.0 Introduction ……………………………………………………………….. 1

1.1 Background of the Study …………………………………………….. 3

1.2 Statement of the Problem ……………………………………………. 5

1.3 Significance of the Study………………………………………………. 6

1.4 Aim and Objective of the Study ………………………………….. 7

1.5 Scope of Study……………………………………………………………… 7

1.6 Limitation of Study ……………………………………………………… 8

CHAPTER TWO

2.0 Literature Review …………………………………………………………. 9

2.1 Scheduling method of Materials…………………………………. 11

2.3 Security System …………………………………………………………. 12

2.3.1 Material Variance Analysis ……………………………………… 12

2.3.2 Variation in Scheduled Completion Time of Building Projects…………………………………………………………………………….. 12

2.3.3 Material Procurement ……………………………………………. 13

2.3.4 Waste Reduction Strategies Prodigal Planning ……..14

2.4 Pre. Construction …………………………………………………… 15

2.4.1. Waste Management Planning………………………………. 16

2.4.2 Construction Contract Require ……………………………. 16

2.4.3 Material Delivery …………………………………………………. 18

2.5 Facility Design ………………………………………………………… 19

2.5.1 Benefit of the Site Management Programmers …… 20

2.5.2 Guide to Formulation of SWMP ……………………………. 21

2.6.1 Commercial Status………………………………………………… 24

2.6.2 Implementation Issue ………………………………………….. 25

2.6.3 Benefit of Using Reclaimed ……………………………………. 26

2.7 Recent studies in Construction Waste Management in Building of Materials in Some Countries…………………………. 26

2.8 Sequence of Purchase ………………………………………………. 27

2.9 Storage of Material and Waste Management on site .. 28

CHAPTER THREE

3.0 research Methodology ………………………………………………. 34

3.1 Methods of Data Collection ………………………………………. 34

3.2 Research Design ………………………………………………………. 35

3.3 Method of Data Analysis ………………………………………….. 36

Reference ………………………………………. 37

Introduction

The Nigerian construction industry continues to occupy an important position in the nation’s economy even though it contributes less than the manufacturing or other service

Industries, (Alinu and Jagboro, 2002). The contribution of the construction industry to national economic growth necessitates improved efficiency in the industry by means of effectiveness and timeliness, and would certainly contribute to cost savings for the country as a whole. It is also common knowledge that the implementation of the construction project in the industry is usually accompanied with time delay and cost increase as well as owner dissatisfaction (Hafez, 2001). In general most (if not all) construction projects experience time delays and cost overruns during their implementation phase (Koushki, and Kartam, 2004) Numerous researcher, both in the developed and developing nations have also examined and identified the causes of time and cost overrun in the construction industry. Mansfield, Ugwu and Doran (1994), for example performed a comprehensive analysis of most important factors responsible for project delays and cost overrun in Nigeria construction project.

This analysis indicated poor contract management, financing and payment of completed works, change in site conditions, shortage of materials, design changes, subcontractor and nominated supplier other factors were price fluctuation inaccurate estimates, delays and additional works as factors responsible for project delays. Recycling is the introduction of management of building materials collected together into some process for remanufacture into a new product, which may be the same production or a completely different product. These recycled materials are reused in the construction process to cut down the cost for the project. Some of the recycled material are used for other project.

The impact of management in the control building materials is to avoid the used of excess amount of materials and a designated temporary pit should be designed where waste materials can be dumped and reused. The effect of sites management of building materials waste or project cannot be ignored as it often leads to increase in construction building sites.
Buy Now
 
JAMB CBT 2024 - Candidates, Schools, Centres, Resellers - Get Ready!
WAEC May/June 2024 - Practice for Objective & Theory - From 1988 till date, download app now - 99995
WAEC Past Questions, Objective & Theory, Study 100% offline, Download app now - 24709
JAMB CBT Mobile App 2024 - Free Download