WAEC offline past questions - with all answers and explanations in one app - Download for free
WAEC May/June 2024 - Practice for Objective & Theory - From 1988 till date, download app now - 99995

Evaluation Of Production Process And Capacity Utilization(A Case Study Of Nigeria Breweries, Enugu)

Type Project Topics (doc)
Faculty Social & Management Sciences
Course Business Management / Management Science
Price ₦3,000
Buy Now
Key Features:
- No of Pages: 100

- No of Chapters: 05
WAEC May/June 2024 - Practice for Objective & Theory - From 1988 till date, download app now - 99995
WAEC offline past questions - with all answers and explanations in one app - Download for free
WAEC Past Questions, Objective & Theory, Study 100% offline, Download app now - 24709
Introduction:

Abstract

This research work aims at critically evaluating the process of production and the extent to which the installed capacity of Nigeria Breweries utilized. The study traced the historical development of the company, its range of production and the extent which its capacity is utilized.



In collecting data for the research, two sources of data collection were used. They are primary and secondary data sources. The primary data were gotten through personal interview and observation, while secondary data were collected from Nigeria Breweries Plc Enugu and other relevant materials and information centres.



From the analysis of the data collected, the following findings were made.



1. There is problem with the acquisition of the spare pars because of the prohibitive price of foreign exchange.



2. Poor Maintenance of frequent machine breakdown, statistics are not kept on the performance of machine.



3. Inadequate raw material which is one of the factors of the full utilization of the installed capacity.



4. Power failure breakdown on the installed capacity, their installation of 15mega watts electric generating plants as a safeguard against intermittent power supply from Power Holding Company of Nigeria (PHCN) the company still suffers from Power Supply problem.



Based on the above findings the following recommendation were offered after analyzing.



1. The rate of breakdown of machines will prevent the purchase of out model, recommendation of periodic maintenance of machine should be adopted to reduce incidence of breakdown.



2. There is high cost of certain items like bear which makes the consumption low. It was recommended that the company should be doing a objective pricing of its goods that it does not price itself out of the market.



3. There is not enough training and development of staffs for proper handling of the facilities of production industries it was recommended that enough training and development of staff should be provided by the company. It will enable them to shift emphasis on keeping track of manufacturing line cost of facilities of production.

Table of Content

CHAPTER ONE



1.1 Background of the Study



1.2 Statement of the problems



1.3 Objectives of the Study



1.4 Scope of the study



1.5 Research questions



1.5 significance of the Study



1.6 Limitation of the study



1.7 Definition of Terms

CHAPTER TWO



2.0 Review Of Related Literature



2.1 Definition and Concepts



2.2 Production Planning and Control



2.3 Activities Involved in Production planning



2.4 Process Planning and Design



2.5 Capacity Utilization



2.6 Material Handling



2.7 Peak Versus Normal Lead Capacity

CHAPTER THREE



3.0 Research Design and Methodology



3.1 Research Design



3.2 Area of Study



3.3 Population of the study



3.4 Sample Determination



3.5 Instrument for Data Collection



3.6 Validation of the Instrument



3.7 Reliability of the Instrument



3.8 Method of Data Collection



3.9 Method of Data Analysis



3.10 Questionnaire Distribution and Retrieval

CHAPTER FOUR



4.0 Data Presentation and Analysis



4.1 Presentations and Analysis



4.2 Summary of Results



References

CHAPTER FIVE



5.0 Discussion, Recommendation and Conclusion



5.1 Discussion of Result Findings



5.2 Conclusion



5.3 Recommendations



Bibliography



Appendix



Questionnaire

Introduction

1.1 BACKGROUND OF THE STUDY



Production management refers to those activities that involve planning, organizing, directing, integration, controlling, and evaluation of the entire process of manufacturing goods or providing services at the right cost and in its right time, quantity, quality and place. Production management is about in the way organization produces goods and services. For instance, everything you eat sit on, read and knock about on the sport field comes to you, courtesy of the production managers who organized its production. Every book you borrow from the library, every treatment you receive at the hospital, every service you expect in the shops and every lecture you attend at school, all have been produced. Production is all evolving. Which the people who supervised their production may not always be called production manager, but that is what they really are (production manager but that is what they really are) production management is concerned with the organization of the use of equipment and their resources. Production management is utilization of the highest production resource at the least cost.



E. U. L. Imaga said that the performance of the managerial activities entailed in selecting. Designing, operating, controlling and updating productive systematically defined production management that it should be pointed out that production first like any other field of study has many definitions as there are participate in the field.



Mayer (1982), defined production with references to goods as the fabrication of a physical object through the use of labour, material and equipment whereas with reference to service, production is the discharge of the function, which is utility. In either case something is being produced which did not exist earlier from the above explanation, production is the transformation of resources into finished goods and services. He also pointed out that any organization which transforms inputs is engaged in production.



Buffa E. S. (1973) said that production is process by which goods and services are created. He also stated further that production process are found in factories, offices and hospitals. The primary aims of the production management is to optimized the production system, the consequent result of optimization is production efficiency.



The dictionary of business management defined production as any activity that adds value to goods and services including transportation and warehousing until it is used. Utility is the ultimate satisfaction derived from the consumption of a particular goods and services.



Devck Labley (1974) said that the process of converting raw or base material originally extracted from the earth, sea or atmosphere into form which yield utility or satisfaction to consumer at a time and place convenience to the consumer. The emphasis is still on the ultimate satisfaction of the consumer which is what production is to bring about this transformation. In some circumstance it is appropriate to produce goods by employed labour to the other factors of production.



Production capacity according to Jerry Rosenbery is the available equipment, the maximum quantity at unit that can be made on stated period the full capacity of production is predetermined and install before the commencement of production process, adequate planning and forecast is made to that effects.



The Dryder Press (1990), said that capacity widely understood by many people can be seen as a ability of a unit to produce that which consumer require and clearly there must be some match between needs characterized by market forecast and ability characterized capacity. In this regard capacity can be by differentiated into three level and they are as follows:



i. potential capacity



ii. Immediate capacity



iii. Effective capacity



Potential capacity is that capacity which can be made available with current budget period.



Immediate capacity is that capacity which is used within the current budget period.



Therefore, production management modifies production policies and some times aids the production engineer to modify design as well since production engineering is more concern with the design of physical equipment.
Buy Now
 
WAEC offline past questions - with all answers and explanations in one app - Download for free
WAEC May/June 2024 - Practice for Objective & Theory - From 1988 till date, download app now - 99995
WAEC Past Questions, Objective & Theory, Study 100% offline, Download app now - 24709
Post-UTME Past Questions - Original materials are available here - Download PDF for your school of choice + 1 year SMS alerts