WAEC May/June 2024 - Practice for Objective & Theory - From 1988 till date, download app now - 99995
Post-UTME Past Questions - Original materials are available here - Download PDF for your school of choice + 1 year SMS alerts

Design And Construction Of A Mobile Refrigerator

Type Project Topics
Faculty Engineering, Environment & Technology
Course Mechanical Engineering
Price ₦5,000
Buy Now
Key Features:
- No of Pages: 57

- No of Chapters: 5
Post-UTME Past Questions - Original materials are available here - Download PDF for your school of choice + 1 year SMS alerts
WAEC offline past questions - with all answers and explanations in one app - Download for free
WAEC Past Questions, Objective & Theory, Study 100% offline, Download app now - 24709
Introduction:

Abstract

This write up focuses attention on a detailed report and account on the process of construction and formulation of plan for the actual and physical realization of the construction of the project work captioned fabrication and construction of a mobile cooling system. The report is therefore divided into chapters and each chapter discussed extensively such that an illiterate refrigerator mechanic who read and comprehends the report can easily carryout the construction of refrigerator under little guidance and supervision.
rnSubsequently, the principles of influencing the operation of a cooling system, choice of materials, various methods used in the fabrication and recommendation for advancement were duely treated.
rnTherefore, as the cooling system composed of mechanical and electric all parts, a lot of effort were made to break and discuss the various stages and sequences of assembly. Stating a quite number of safety rules which must be adhered strictly to by and intended person or persons, who may embark on the project in future to achieve a positive result.
rn
rnFinally, this write up also encompasses the maintenance of any cooling system irrespective of the size and make without limiting it to only mobile refrigerator, with due consideration that we are in the modern age of refrigeration due to the gradual destruction of the ozone layer, so that any person who seized the opportunity of reading through the report can maintain such equipment no matter the size and complexity with ease and save himself from being overheated by the sun.

Table of Content

Title page
rnLetter of transmittal
rnApproval page
rnDedication
rnAcknowledgement
rnAbstract
rnTable of contents
rn
rnCHAPTER ONE
rn1.0Introduction
rn1.1Purpose Of Construction
rn1.2Importance And Specification Of Project
rn1.3Scope And Limitations
rn1.4Statement Of Problems
rn
rnCHAPTER TWO
rnLITERATURE REVIEW
rn2.0The History Of Refrigeration
rn2.1The Reversed Cannot Cycle
rn2.2Condition At The Compressor Inlet
rn2.3Sub Cooling Of The Condensed Vapour
rn2.4Selection Of Material
rn
rnCHAPTER THREE
rn3.0Construction Details
rn3.1General Safety Rule
rn3.2Construction Method And Procedure
rn3.3Laying Of Evaporator Pipe (Piping)
rn3.4Lagging
rn3.5Electrical System In The Fridge
rn3.6Description Of The Unit/Principle Of Operation
rn
rnCHAPTER FOUR
rn4.0Construction Analysis
rn4.1Heat Leakages Through The Boundaries
rn4.2Refrigeration
rn4.3The Evaporator
rn4.4The Evaporator Capacity Size
rn4.5The Condenser
rn4.6The Capillary Tube Size
rn4.7Co-Efficient Of Performance
rn
rnCHAPTER FIVE
rnSummary
rnRecommendation
rnConclusion
rnReferences

Introduction

The introduction of this research is only available in the paid version.
Buy Now
 
WAEC Past Questions, Objective & Theory, Study 100% offline, Download app now - 24709
WAEC offline past questions - with all answers and explanations in one app - Download for free
WAEC May/June 2024 - Practice for Objective & Theory - From 1988 till date, download app now - 99995
Post-UTME Past Questions - Original materials are available here - Download PDF for your school of choice + 1 year SMS alerts