WAEC May/June 2024 - Practice for Objective & Theory - From 1988 till date, download app now - 99995
WAEC Past Questions, Objective & Theory, Study 100% offline, Download app now - 24709

A Proposal on Assessment of Risk on Road Projects in Nigeria Construction Industry (A Case Study of Lagos Metropolis)

Type Project Topics (docx)
Faculty Engineering, Environment & Technology
Course Quantity Surveying
Price ₦3,000
Buy Now
Key Features:
No. of pages: 62
Post-UTME Past Questions - Original materials are available here - Download PDF for your school of choice + 1 year SMS alerts
WAEC Past Questions, Objective & Theory, Study 100% offline, Download app now - 24709
WAEC offline past questions - with all answers and explanations in one app - Download for free
Table of Content:
Title page i

Certification ii

Dedication iii

Acknowledgement iv

Abstract v

Table of Content vi

CHAPTER ONE:


1.0 Introduction

1.1 Background of the study

1.2 Statement of problems

1.3 Research questions

1.4 Aim and Objectives

1.5 Justification of the study

1.6 Scope and Limitation of the study

1.7 Research Methodology

CHAPTER TWO


Literature review

2.0 Introduction

2.1 Nature of civil engineering project

2.2 Road

2.2.1 Road construction

2.2.2 State of roads in Nigeria

2.3 Risk in construction

2.4 Risk exposure

2.5 Risk management

2.6 Types of risk

2.6.1 Controllable and Uncontrollable risk

2.6.2 Pure risk and speculative risk

2.7 Identifying risk and risk factors

2.8 Impact of risk on total construction cost and project duration

2.9 Risk analysis

2.10 Risk response

2.10.1 Risk avoidance

2.10.2 Risk retention

2.10.3 Risk deduction

2.10.4 Risk Transfer

CHAPTER THREE


Research Methodology

3.0 Introduction

3.1 Study population

3.2 Sample size and sampling procedure

3.3 Design of Questionnaire

3.4 Method of data analysis

CHAPTER FOUR


Data presentation and data analysis

4.0 Introduction

4.1 Data analysis and result interpretation

CHAPTER FIVE


Summary, Conclusion and Recommendation

5.0 Conclusion

5.1 Recommendation

References
Introduction:
Consequences of uncertainty and its exposure in a project, is risk. In a project context, risk is the chance of something happening that will have an impact upon objectives. It includes the possibility of loss or gain, or variation from a desired or planned outcome, as a consequence of the uncertainty associated with following a particular course of action. (Deviprasadh, 2007). Risk thus has two elements: the likelihood or probability of something happening, and the consequences or impacts if it does. Managing risk is an integral part of good management; it is fundamental to achieving good business and project outcomes and the effective procurement of goods and services Risk management provides a structured way of assessing and dealing with future uncertainly. Project risk management includes the processes concerned with identifying, analyzing, and responding to project risk. It includes maximizing the results of positive events and minimizing the consequences of adverse events." (Deviprasadh, 2007).
Buy Now
 
WAEC offline past questions - with all answers and explanations in one app - Download for free
WAEC May/June 2024 - Practice for Objective & Theory - From 1988 till date, download app now - 99995
WAEC Past Questions, Objective & Theory, Study 100% offline, Download app now - 24709
Post-UTME Past Questions - Original materials are available here - Download PDF for your school of choice + 1 year SMS alerts